Start here / 10 Roadmap and operating plan

12-Month Commercial Growth Roadmap

The team can run the year's work with the files it already has

A plan without a person on each line is a wish list.

Who does what on Monday, with which file, and what for?

October 2026 to September 2027 · working version of 30 September 2026

This page as PDF

1 to 16 Oct 2026

First · inputs and access

Leadership's inputs and the accesses. The team starts on what is known.

Oct to Dec 2026

Q4 · publish

First pages, case one, weekly content, the upsell play and the first two monthly reviews.

Jan to Mar 2027

Q1 · consolidate

Cases two and three, the data-center page if validated, partner activation.

Apr to Sep 2027

Q2 and Q3 · amplify and defend

Press and talks, second content wave, full rival re-sweep, annual re-read.

What you are seeingA recipe book. Each row is one dish: the cook, the steps, the ingredients already in the pantry (the files of this repository) and what the guest gets.

Each line of work has one owner

LineWhat it deliversRole that owns itName
Published proofCases, FAQ, measured site behavior, pressMarketing lead, with the engineering lead as technical gatethe role, until leadership writes a name
Buyer-language pagesThe 42 website changes, new pages, weekly content, profilesMarketing lead with the web administratorthe role, until leadership writes a name
Sales and channelBattlecard in use, upsell play, packager list, radar readSales lead for Power Generationthe role, until leadership writes a name
MeasureKey events, baseline table, monthly and quarterly reviewsAnalytics ownerthe role, until leadership writes a name

Twelve months on one line per owner

Sprint 0 · Oct 1 to 16Q4 2026Q1 2027Q2 2027Q3 2027Leadership inputsFigures, wording, namesFigures,wording, namesPublished proofCase one, FAQ, press, site proofCase one, FAQ,press, site proofCases two and threeCases two andthreeTrade features, talksTrade features,talksBuyer-language pagesAccessAccess10 changes, 2 pages, content10 changes, 2pages, contentData-center page if validatedData-center pageif validatedSecond content wave, 100+ ranked searchesSecond content wave, 100+ rankedsearchesSales and channelUpsell, packagers, radarUpsell,packagers, radarPartner activation and kitPartneractivation and kitRival re-sweep, battlecard v2Rival re-sweep,battlecard v2MeasureKey events, baseline frozenKey events,baseline frozenPrompt wave 1, two reviewsPrompt wave 1,two reviewsQuarterly review, wave 2Quarterlyreview, wave 2Annual re-read, re-rankAnnual re-read,re-rank
One row per line of work, October 2026 to September 2027. Working version of 30 Sep 2026; roles own each line until leadership writes names.

First: the inputs and the access that sharpen everything else

1 to 16 October 2026

WhatWho (role at EKU)HowSupport in this repositoryWhat forDone whenLine and date
Return the field case with corrected figuresLeadershipEdit the figures in the editable case file, state which numbers are engine data and which are savings, and return the file.Case status note, folder 07Case one, its FAQ and the press path carry EKU's own figures.The editable file returned, with every figure marked engine data or savings; the case page passes the language check.Leadership inputs
Sprint 0 · 1 to 16 Oct 2026
Confirm the technical wording with engineeringLeadership with the engineering leadGo line by line: keep, reword or remove. Twelve message lines, nine compatible brands, the five layers of the diagram and three yes-or-no answers on site logs.Leadership inputs, with the full listWebsite copy, battlecard lines and compatibility statements use the confirmed wording.Each line of the list marked keep, reword or remove.Leadership inputs
Sprint 0 · 1 to 16 Oct 2026
Confirm the revenue-map inputs in writing, or share the CRM exportLeadershipReply to the five inputs in the closing note (size bands, count by band, time to close, segment mix, capacity).Revenue map closing noteTurns the revenue map from a working document into the ranking that targets use.One email or export with the five inputs; the ranking re-run and dated.Leadership inputs
Sprint 0 · 1 to 16 Oct 2026
Name one owner per workstream and set the December review dateLeadershipFill the four name fields in this roadmap and put three dates in the calendar: 30 Oct, 27 Nov, and December.This roadmapEvery line below has a person, not only a role.Four names in this roadmap and three calendar invitations accepted.Leadership inputs
Sprint 0 · 1 to 16 Oct 2026
Mark the website key events and freeze the measurement baselineAnalytics ownerIn site analytics mark the five events of the channel plan: contact or quote form sent, brochure or spec sheet downloaded, demo request clicked, packager kit downloaded, outbound click to the customer portal. Start with the downloads. Save the 30 Sep numbers as the baseline.Baseline table
Steps in the website plan
Results start reporting business signals, not visits.The available key events reporting in analytics (the kit event starts with the kit); the 30 Sep column saved as read-only in the workbook.Measure
Sprint 0 · 1 to 16 Oct 2026

Then: publish the first proof and the first buyer-language pages

October to December 2026

WhatWho (role at EKU)HowSupport in this repositoryWhat forDone whenLine and date
Ship the website changes marked readyWeb administrator with the marketing leadFollow the plan in order: request indexing of the Power Generation page, remove the retired wording live on four pages, fix titles and descriptions.Website change plan
Backlog sheet in the workbook
The growth segment page enters Google; the site stops contradicting the approved language.The ready rows marked done in the workbook; a crawl the next day finds zero retired wording on the four pages.Buyer-language pages
Q4 2026 · October
Publish the Power Generation landing and the Maximus ecosystem hub, with FAQ and structured dataMarketing lead with the web administratorPaste the approved blocks, add the structured data, link both pages from the home page, request indexing the same day.On-page pack
Approved language
First pages that answer a buyer's problem. KPI: informational pages indexed, from 0 to 14 or more in 12 weeks.Both pages live, indexed (Search Console shows impressions), FAQ structured data validated.Buyer-language pages
Q4 2026 · by 31 Oct
Publish case one with its FAQ, then open the press pathMarketing lead, technical validation by the engineering leadPublish the case page, the FAQ and the one-page summary; send three pitches from an EKU address to the outlets on the map.Press target map
FAQ blocks
KPI: named reference cases published, from 0 to 1 in 12 weeks and 3 by mid-2027.Case page live with confirmed figures; three pitches sent from an EKU address and logged.Published proof
Q4 2026 · November
Run the 12-week content rollout from the six briefsMarketing leadOne approved piece per week: idle management first, then generator control panel, monitoring, the Power Asset Readiness pillar. Each piece passes the language check before it goes live.The six briefs (AI and search content section)
Field terms
KPI: US searches where EKU ranks (all intents), from 37 to 55 to 70 in 12 weeks; the four open terms enter pages 1 to 2.Twelve pieces live, one a week, each passing the language check before publication.Buyer-language pages
Q4 2026 · October to December
Close the profile gaps: business profile description, four industry directories, one company description everywhereMarketing leadPublish the approved description, request the US verification, create the four listings with the same sentence.The one descriptionAI assistants and buyers find the same company in every place they check.Business profile verified in the US; four listings live with the same sentence.Buyer-language pages
Q4 2026 · October
Run the upsell play on the installed base (fleets already running GeneSys or Sophia)Sales lead for Power GenerationList the installed sites, open each call with the brand-count question, offer the ecosystem as the next step.Battlecard
Revenue map
Shortest path to connected units in 2027; shortens the 4.5-month cycle.Every installed site called once; outcomes logged; objections fed into the battlecard.Sales and channel
Q4 2026 · November
Build the priority packager list with one seller as counterpartSales lead with leadershipRank packagers by bids in the next two quarters; give each one the fleet question and the one description to repeat.Ecosystem and channel roles
Partner map (Partner map section)
About 70% of revenue flows through packagers (leadership interview, 24 Jul 2026).A list of named packagers with a seller next to each and a first conversation dated.Sales and channel
Q4 2026 · November
Read the radar every Monday and update the battlecard when an answer changesMarketing lead runs the sweep; engineering lead validatesThirty minutes: check the sources listed in the update, log the move with date and source, change the battlecard answer only if the buyer would notice.Radar update and weekly routine
Battlecard
Sales hears about a rival move before the prospect mentions it.Four dated entries a month in the radar sheet; battlecard version number moves when an answer changes.Sales and channel
Q4 2026 · weekly from October
Measure and publish how a whole mixed-brand site behaves with the cloud link downEngineering leadOn one real site record four numbers: response time, hours sustained, repeatability, and the sequence when the link drops. Date it and state the asset mix.What the market will ask EKU to publish (radar)The rival documents read hold no measured report of a whole mixed-brand site with the cloud link down. A measured report replaces every exclusivity claim.A dated report with the four numbers on one site, confirmed by the engineering lead, and a page that publishes it.Published proof
Q4 2026
Hold the monthly review with the same rulerAnalytics owner presents; leadership decidesAdd one column to the baseline table, re-read the results pages for the two tracked terms, review the claims list, set next month's queue.Baseline table
Workbook
Every month closes with a written, dated summary.A new column in the baseline table and a one-page written summary the same day.Measure
Q4 2026 · 30 Oct and 27 Nov
Capture wave 1 of the 37 locked promptsMarketing leadFollow the protocol sheet: new accounts, one chat per prompt, exact wording, no follow-up questions, all in one or two days.AI baseline trackerStarts series A, the trend line. The short panel of seven questions is run in the same sitting and reported on its own: from 0 of 7 to 2 of 7 in 12 weeks.111 runs plus 5 stability runs logged and series A reported on its own; the seven short questions run on the three assistants and counted separately.Measure
Q4 2026 · October

Next: consolidate what the first quarter proved

January to March 2027

WhatWho (role at EKU)HowSupport in this repositoryWhat forDone whenLine and date
Publish cases two and three, with Spanish versions of all casesMarketing leadReuse the structure of case one: problem, scope, assets, what the site did on its own, result, quote.Folder 07Three named reference cases by mid-2027.Three case pages live in English; Spanish versions attached for the Latin American sellers.Published proof
Q1 2027 · January to March
Open the data-center subpage once leadership validates the segmentMarketing lead after leadership's decisionUse the gated brief; publish only with a validated case or a measured site behavior.Brief 6, data-center primerEnters the segment where rivals already exhibit and advertise.A written go from leadership, then the page live with one validated proof.Buyer-language pages
Q1 2027
Activate partners: packager enablement kit and the mining and regional annexSales leadOne spec-ready page per product family and a compatibility list confirmed by engineering.Folder 08Packagers can repeat the message without EKU in the room.Kit sent to the listed packagers; annex pages live after approval.Sales and channel
Q1 2027
Second quarterly review and second prompt waveAnalytics owner; leadershipSame four boards: before and after, claims list, rival re-read, next quarter's order.Baseline tableFirst like-for-like reading after publication.Wave 2 logged; four boards reviewed; next quarter's queue written.Measure
Q1 2027 · March

Later: amplify, then defend and re-read

April to September 2027

WhatWho (role at EKU)HowSupport in this repositoryWhat forDone whenLine and date
Amplify: trade features, technical talks, partner co-announcementsMarketing lead with the engineering leadPitch the measured-site story to the beat journalists on the map; submit one technical talk per event.Press target mapThird-party citations, the shortest route into AI answers.At least one published feature and one accepted talk, both logged with links.Published proof
Q2 2027 · April to June
Second content wave on what the first one proved; comparison pages only with leadership's approvalMarketing leadDouble down on the pages that reached pages 1 to 2; generic comparisons first, rival-named pages only when approved.BriefsKPI: 30 or more informational pages indexed; 100 or more ranked searches.Twelve more pieces live; any rival-named page carries leadership's approval.Buyer-language pages
Q2 2027
Full competitive re-sweep and battlecard rebuildEngineering lead and sales leadRe-read every rival in the five tiers, re-rank risk, rebuild the comparison table with measured proof.RadarThe battlecard enters its second year with evidence, not adjectives.Every rival re-read with a date; battlecard v2 issued to sellers.Sales and channel
Q3 2027 · July to September
Annual re-read against the 30 Sep 2026 baseline and re-rank of the revenue mapLeadershipRead every line of the baseline table again, compare, decide the next twelve months.Baseline table
Revenue map note
A dated answer to: did buyers with a problem start finding EKU?A dated comparison of every line of the baseline table and a re-ranked map.Measure
Q3 2027 · September

The website plan runs in two waves

The first wave carries every page a buyer with a problem can find. EKU sets the pace: its own team knows its own calendar.

Phase of the website planChanges
Week 1 after access10
Weeks 2 to 514
Months 2 and 316
Later, 20272
Total42
Recommendation. Run the first 24 changes in October and November with the team EKU has. Move the other 18 to the first quarter of 2027. The first 24 carry every page a buyer with a problem can find.

The scoreboard: where each number starts and where it should be

Metric (the instrument stays fixed)Baseline12-week targetMid-2027 target
Informational pages indexed014 or more30 or more
Page 1 to 2 rankings on three target terms, chosen in Sprint 0 from the four open buyer terms0 of 32 of 33 of 3, plus the next set
Mentions of EKU in the seven-prompt battleground panel0 of 72 of 74 of 7
US searches where ekupd.com ranks, all intents29 (15 Jul); 37 (30 Sep)55 to 70100 or more
Industry directory listingsabout 04kept current, with reviews
Houston local results for "generator retrofit"absenttop 3held
Named reference cases published013
Website key events0 configuredreportinggrowth quarter over quarter

Baselines from the baseline table of 30 September 2026. Targets are working targets and commitments of effort, never revenue forecasts. They are revisited at every quarterly review and updated in place, with a dated note, when the revenue-map inputs are confirmed.

The rhythms that keep the plan running

Weekly · 30 minRadar read, one content piece approved, website changes of the week.
Marketing lead
Monthly · 1 hourBaseline table with a new column, claims list, next month's queue. 30 Oct and 27 Nov 2026.
Analytics owner presents; leadership decides
Quarterly · 1 hourFour boards: before and after, claims validated, rival re-read, next quarter's order with a "not now" list. Dec 2026, Mar, Jun and Sep 2027.
Leadership
The rules that do not change
For leadership: four names and the December review date

The input: one name per line of work and the date of the December review. What it unlocks: every row above gets a person, and the quarterly rhythm starts.

For leadership: the revenue-map ranges refine the targets

The input: EKU's own ranges for the revenue map, or the CRM export. What it unlocks: lead-quality and revenue-linked targets can be added to the scoreboard.

Closing

Strategic conclusion

Ninety days built the foundation EKU asked for. This is the twelve months of work, and EKU's own team can run it with the files it already holds.

Commercial implication

One case and the first pages by December. Then a year of adding to them, until a buyer who asks about a mixed fleet gets EKU in the answer.

Recommended use

Open this page every Monday. Track each row in the workbook sheet "Roadmap". Review it at the monthly and quarterly rhythm.

Validation status. Working version of 30 September 2026. It replaces the operating plan of 3 September. Roles own each line until leadership writes names. Targets pending the written Revenue map inputs.

Working foundation for executive review. Not approved external copy. Prepared for EKU Power Drives, 30 September 2026, by KanbinaLUMINA